Showing posts with label roadworks. Show all posts
Showing posts with label roadworks. Show all posts

Monday, May 23, 2011

Sheet villagers enraptured

 
It’s a sign

East Hampshire District Council (EHDC) has been left in financial dire straits after the world failed to end on May 21.

In an effort to appease the village-folk of Sheet, EHDC agreed to impose a range of expensive traffic measures in the village, and they did this on the understanding that they would never actually have to foot the bill.

Changes were put in place which, it is claimed, will stop the northern part of Sheet village being used by motorists who are "just passing through".

Vehicles travelling south along London Road from Rake towards Petersfield cannot now turn right down Village Lane and additional road blocks have been set up in Farnham Road, Inmans Lane and Town Lane. A guard tower has also been erected beside the old chestnut tree to enforce the changes.

Most of the expense has been incurred, however, across London Road in southern Sheet where Pulens Lane has been reinforced and resurfaced.

The once quiet lane that runs north beside historic Sheet Mill will be applying for Motorway status. This will in turn pave the way for a service station to be opened up on the Heath, an idea put forward by The Big School who, since school improvements, now have an on-site oil refinery.

Petersfield Town Council's spokesperson for roads, Emma Huan, told Newswire: "We obviously thought it would never actually happen, what with the world ending and everything.

"Now ‘Rapturing’, as I understand it is known, has failed to take place, we are left with a ruddy great roadworks bill. On the up-side we can push through with the service station idea to try to recoup some dosh."

Tuesday, March 29, 2011

Petersfield's roadworks mystery is solved

The mysterious case of Petersfield’s disappearing roadworks has been solved.

At the beginning of the month, residents of Pulens Lane and nearby roads braced themselves for chaos after signs went up advising that the road would be closed for a week’s repair works.


Yet the daunting prospect of having to drive their 4x4s an extra half-a-mile to circumnavigate the roadworks never materialised as the road was never closed and the signs mysteriously disappeared after a week’s inactivity.

Rumours of alien abduction swept across the bar at the Drum public house as a man who had once staggered down Pulens Lane claimed he’d seen the roadworks collected up and put on to the back of a spaceship with flashing lights by little luminous green and yellow creatures.

More prosaically, it turns out the council simply exhausted its budget.

A spokesman for the council explained: “March is the time of year when we schedule dozens of superfluous road repairs simply because we have to use up all of our budget – or it gets cut the following year.

“This year we scheduled Pulens Lane for action but the cost of preparing those yellow signs with the flip-over numbers has gone up and once we’d manufactured and installed the signs there was no budget left to actually dig up the road. We had barely enough for the workmen to brew up before they took the signs down again.

“We had some spray cans of white paint left over, so we went round and marked up a few potholes but don’t actually expect to do anything with them until at least 2013/14.”

Garstang Leaf-Blower, a resident of Pulens Lane, said: “I had heard this rumour from a reporter with the Petersfield Newswire, but bizarrely this may actually be true. I think it’s also important to realise that Pulens Lane is actually in the parish of Sheet, not Petersfield. The two don’t mix really.”

The council spokesman confirmed more non-existent roadworks are planned for June, August and September. No delays are expected until October.